NEED A PERFECT PAPER? PLACE YOUR FIRST ORDER AND SAVE 15% USING COUPON:

SOLVED

27) Find the minimum cost solution for the transportation problem detailed in the table below. Before your solution can be implemented, you discover that the combination Source 3 — Destination 1 is unavailable, due to political turmoil in the country where Source 3 is located. Solve the revised problem. How much is cost increased by this complication? 28) A firm has established a distribution network for the supply of a raw material critical to its manufacturing. Currently there are two origins for this raw material, which must be shipped to three manufacturing plants. The current network has the following characteristics: The firm has identified two potential sites for a third raw material source; these are identified as Candidate A and Candidate B. From A, the costs to ship would be $9 to Plant 1, $10 to Plant 2, and $12 to Plant 3. From B, these costs would be $11, $14, and $8. The new source, wherever it is located, will have a capacity of 500 units. Solve with the transportation method. Which site should be selected? 29) A manufacturer of semiconductor “wafers” has been attempting to convert its operations to practices more in keeping with JIT principles. The firm is now paying much more attention to the transit time between one processing stage and the next. The plant has a somewhat haphazard pattern of machine locations, partly because the machines were purchased and installed at different times, partly from a shortage of floor space, and partly from previous experiments with work cells. The bottom line is this: there are four machines that perform a certain processing phase, and three machines that perform the next phase. All units of a large class of wafers go through these two phases. The table below displays the transit time, in minutes, from each machine of the first phase to each machine of the second. Machine 3 is not really 100 minutes away from machine B; the company has prohibited that combination because of quality problems associated with that specific pairing. Supply and demand quantities are in wafers processed per week. Develop a transit time minimizing solution for this firm. What is the total transit time of this solution? Which machines are fully utilized? Which machines have some capacity unused or requirements unfilled? Was the prohibition on the 3-B combination honored?

Solution:

15% off for this assignment.

Our Prices Start at $11.99. As Our First Client, Use Coupon Code GET15 to claim 15% Discount This Month!!

Why US?

100% Confidentiality

Information about customers is confidential and never disclosed to third parties.

Timely Delivery

No missed deadlines – 97% of assignments are completed in time.

Original Writing

We complete all papers from scratch. You can get a plagiarism report.

Money Back

If you are convinced that our writer has not followed your requirements, feel free to ask for a refund.